Description
The ground floor school had its area invaded by the flood, which took over the neighbourhood and the square where it is located. Now, the 50 primary school children are waiting for the Meu Amiguinho space to resume its activities. A school with a ground floor block, the water invaded the school. As the whole area is inaccessible, it is not possible to determine the impact on the interior of the building. Type B school, caters for around 51 pupils at an average cost of R$3,127.31 per student. Estimated value of the investment for renovation: R$ 427.982,00.
Details
-
ResponsibleSMED
-
Impact levelPartially flooded
-
Affected area (m²)270
-
Population attended51 families
-
ClassificationReform
-
Donation statusAdopted