Description
A school with a ground floor block was flooded and is now inaccessible. It is not yet possible to assess the impact on the interior of the building. School with ground floor block, the water invaded the school, as the whole area is inaccessible, it is not possible to specify the impact on the interior of the building. The Type 1 and Type A schools cater for around 69 pupils at an average cost of R$ 6,254.62 per student. Estimated value of the investment for renovation: R$ 312.220,00.
Details
-
ResponsibleSMED
-
Impact levelPartially flooded
-
Affected area (m²)283
-
Population attended69 families
-
ClassificationReform
-
Donation statusAvaliable